System Performance Checks
Current performance, measured against the standards your plant was designed to.
Most plants have no idea how far they have drifted, because nobody has compared the plant as it runs today against the numbers it was designed to hit. A performance check does exactly that, one component at a time, in a single day on site.
You end up with a written evaluation of every stage — what it is achieving, what it should be achieving, and what to change. It is a one-time, fixed-cost activity and the sensible first step before committing to any contract.
Comprehensive Water Optimisation is a three-part offer. The performance check is the diagnosis; everything after it is treatment.
Each stage gets a media and equipment check, plus the hydraulic and quality measurements that reveal whether it is doing its job for the stage that follows it.
A detailed report on each component — PSF, ACF, softener, UF, RO — carrying evaluation, performance and specific recommendations under each of the following heads.
Send us your feed water analysis and design parameters, and we will confirm a date. Fixed cost, no contract commitment.